Daytime EL Inspection for Desert & Gobi Large-Base PV Plants

ⓘ This article is currently published in Chinese. An English version is being prepared — read the Chinese original.

China's desert and Gobi "large-base" PV projects are being connected to the grid in waves. This article explains why transport and installation cracks run high in these harsh sites, why daytime no-shutdown EL matters when downtime is costly, and how to combine pre-grid sampling with drone EL surveys across hundreds of thousands of modules.