Does EL Inspection Require Shutting Down the Plant?
ⓘ This article is currently published in Chinese. An English version is being prepared — read the Chinese original.
EL requires injecting current into modules, so the inspected string must be taken offline, but not the whole plant. This article explains the power arrangements and how to minimize generation loss.
Need a tailored EL inspection plan?
Get a plan Leave your project details and our engineers will advise on method and equipment.